On the Gulf Coast, continuity planning has a calendar. A storm can affect power, connectivity, and access to buildings across an entire region at once, which changes how infrastructure should be designed.
Separate by geography
If production and backups sit in the same area, a regional event can affect both. At least one protected copy of critical data should live well outside your local risk zone.
Decide before the forecast
Failover decisions are hardest in the moment. Define in advance who can trigger a move to recovery systems, and what conditions justify it.
Plan for people
Staff may be evacuated or without power. Recovery procedures should work remotely and should not depend on one person being available.

